top of page

In Review: Long leads "The Tibetan Book of the Dead" at Eastman

  • ebrown9879
  • Mar 9, 2023
  • 1 min read

Tibetan Book of the Dead by Ricky Ian Gordon – Eastman Opera Theatre


“Eastman's take on "The Tibetan Book of the Dead" leaves the audience with plenty to ponder: a heartfelt reflection on death as a vital part of life, sung with conviction and manifested through intelligent set design by Daniel Hobbs and deft musical direction by conductor Timothy Long.”


Comentarios


bottom of page